Prime contractor’s project manager overseeing the Building Information Model (BIM), supporting the Business Process Analysis, Systems Integration, and Development Support Services Contract at the Pentagon. This project included business process and requirements analysis, workflow development, an SOA-based systems integration design, and development of two prototype BIM models. The business drivers were the client’s need to digitize, store, manage and provide online access to tens of thousands of electronic and paper drawings and documents produced during facility upgrades and modifications during the building’s continuing renovations.
Moreover, the BIM system implemented the Client’s facility management process, making it easier to track work orders, locate the rooms with identified facilities maintenance problems, and to provide online access to both digitized drawings and documentation for maintaining, replacing and repairing the room and its electricity, plumbing, and furniture components.
Leave A Comment